- Borne, M., Borne, P. (2002). Balanced scorecard (H. Taghavi. Trans). Tehran: Rasa (Persian).
- Chen, L. Y., & Wang, T-Ch (2009). Optimizing partner Choice in IS/IT outsourcing projects: The strategic decision of fuzzy VIKOR, International Journal of Production Econimics, 120(1), 233-242.
- Geahchi, S., & Akhbare, M. (2017). The economic justification of the project for the construction and operation of the sports complex of the sauna and the pool. Paper presented at the Third Annual Conference on Architecture, Urban Planning and Urban Management. The Architectural and Urban Design Institute of the Safiran Road Mehrazi, (Persian).
- Gholami Torkslouyeh, S., & Mehdi Pour, Asmasha, T. (2015). Evaluation of the health and safety of multi-purpose gyms and its relationship with the occurrence of injuries. Applied research in sports management. 4(14), 23-34. (Persian).
- Güngör, Z., Serhadlıoğlu, G., & Kesen, S. E. (2009). A Fuzzy AHP approach to personnel selection problem. Applied Soft Computing, 9(2), 641-646.
- Hesham, A., Remon, F., & Enas, S. (2018). Identification of construction subcontractor prequalification evaluation criteria and their impacton project success. Alexandria Engineering Journal, 18(4), 83-92.
- Higgs, G., Mitch, L., & Paul, (2015). Accessibility to sport facilities in Wales: A GIS-based analysis of socioeconomic variations in provision, Geoforum,
62, 105-120.
- Huang, Y., & Yan, Y. (2008). Reaserch of evaluating credit-risk in powerenterprise based on SVM and VIKOR method. Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management, Singapore.
- Junior, F. R., Osiro, L., & Carpinetti, L. C. (2014). A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Applied Soft Computing, 31(21), 194-209.
- Khosravani, M. (2011). Dispute resolution management in the design of a sports complex. Paper presented at the Seventh International Project Management Conference, Iran Project Management Association, Tehran. (Persian).
- Liao, H., & Xu, Z. (2013). A VIKOR-based method for hesitant fuzzy multi-criteria decision making. Fuzzy Optimization and Decision Making, 12(4),
373-392.
- Liu, J. H., & Chuang, Y-T. (2010). Developing a hybrid multi-criteria model forselection of outsourcing providers. Expert Systems with Applications,
37, 3755-3761.
- Molanori, M., Molanouri Shamsi, M., & Ganjanian, H. (2016). Choosing the best place to build an exercise complex using the ANP Model (Case Study: Central Yazd Division). Journal of Sport Management, 34, 777-795. (Persian).
- Naji Azarpour, S., & Teimuri, A. (2018). Evaluation and selection of contractor in construction projects with the supply chain management approach and using the PROM the method E. Sharif Journal of Industrial Engineering and Management, 1, 29-37. (Persian).
- Nicole, S. N., Yiua, D. W. M., & Chana, N. N. (2019). Implementation of safety management system in managing constructionprojects: Benefits and obstacles. Safety Science, 117, 23-32.
- Parhisghar, M. (2011). Presentation of balanced scorecard performance indicators. Scientific Journal, 9(2), 12-18. (Persian).
- Sabt, M., Adli, A., & Nagash Toosi, H. (2017). An integrated framework for project performance evaluation from the viewpoint of manufacturing industry contractors. Sharif Civil Engineering (Sharif Civil Engineering), 33(4), 83-95. (Persian).
- Sanayei, A., Farid Mousavi, S., & Yazdankhah, A. (2010). Group decision making process for supplier selection with VIKOR under fuzzy environment. Expert Systems with Applications, 37(1), 24-30.
- Wang, A., Ma, M., Wu, G., Liu, Y., Gong, Zh., & Xiaoyan, Ch. (2019). Conflicts concerning construction projects under the challenge of cleaner production: Case study on government funded projects. Journal of Cleaner Production.
225, 664-674.
- Yang, Y.P., Shieh, H-M., & Tzeng, G-H (2013). A VIKOR techniquebased on DEMATEL and ANP for information security risk control assessment. Information Sciences, 232, 482–500.
|